Building safer, smarter projects in Ghana.Mon–Sat: 8:00am–6:00pm0256 264 142pinteq.ghanaltd@gmail.comWhatsApp
PINTEQ Gallery

Project visuals, progress photos and completed work.

A simple gallery for showing what PINTEQ can do, what is currently in progress, and what has already been completed.

Section 01

Work PINTEQ can do

These visuals show PINTEQ’s capability across construction, engineering supervision and architectural design concepts.

Apartment block concept render
01

Apartment block concept render

Architectural design concept for a modern multi-storey apartment block.

Aerial apartment concept render
02

Aerial apartment concept render

Architectural concept render showing a large residential block with roofing and landscaping.

Modern residential concept render
03

Modern residential concept render

Architectural concept render for a modern apartment building with balconies and parking.

Premium residential concept render
04

Premium residential concept render

Architectural concept render showing a modern residential building with terrace and exterior lighting.

Multi-storey design concept render
05

Multi-storey design concept render

Alternative architectural concept view of a multi-storey mixed-use building.

Section 02

Work in progress

Real ongoing work — site activity, concrete works, formwork, foundations, inspections and project updates.

Concrete pouring on active site
01

Concrete pouring on active site

Concrete mixer truck supplying wet concrete while workers spread and level it on site.

Large foundation and column works
02

Large foundation and column works

Wide site view showing reinforced columns and foundation-stage structural works.

Formwork and site supervision
03

Formwork and site supervision

Workers and supervisors installing large vertical formwork panels on site.

Reinforced staircase preparation
04

Reinforced staircase preparation

Steel reinforcement layout for staircase and slab construction.

Structural wall reinforcement
05

Structural wall reinforcement

Reinforcement and formwork installation for structural wall and column works.

Column shuttering and support works
06

Column shuttering and support works

Timber shuttering, scaffolding and support works for reinforced concrete columns.

Column casting preparation
07

Column casting preparation

Workers preparing reinforced concrete column formwork on site.

Foundation reinforcement layout
08

Foundation reinforcement layout

Steel reinforcement grid prepared for foundation and slab works.

Foundation column setting out
09

Foundation column setting out

Column reinforcement and formwork preparation during foundation construction.

Foundation columns and excavation
10

Foundation columns and excavation

Foundation excavation with reinforced concrete columns under construction.

Large site foundation overview
11

Large site foundation overview

Aerial view of foundation and column works across a large construction site.

Staircase formwork detail
12

Staircase formwork detail

Timber formwork and reinforcement around staircase construction.

High-level site overview
13

High-level site overview

Wide project view showing excavation, columns and foundation progress.

Concrete staircase casting
14

Concrete staircase casting

Concrete staircase works being formed and finished on site.

Basement structural works
15

Basement structural works

Reinforcement, shuttering and concrete preparation on an active building site.

Rebar inspection on site
16

Rebar inspection on site

Site supervision around reinforcement works before concrete casting.

Engineering supervision and measurement
17

Engineering supervision and measurement

Site team checking reinforcement and structural layout before concrete works.

Retaining wall formwork
18

Retaining wall formwork

Timber formwork and concrete preparation along retaining wall works.

Column formwork installation
19

Column formwork installation

Column formwork and reinforcement works in progress.

Foundation formwork channel
20

Foundation formwork channel

Prepared timber formwork and foundation channel before concrete placement.

Staircase reinforcement detail
21

Staircase reinforcement detail

Reinforcement and shuttering detail for staircase construction.

Section 03

Completed work

Finished projects and final handover pictures will appear here when PINTEQ adds completed-work photos.

Completed building systems
01

Completed building systems

Use this section for finished installations, tested systems and completed handover photos.

Completed construction work
02

Completed construction work

Use this section for completed construction, renovation or civil-work project photos.

Finished safety/protection work
03

Finished safety/protection work

Use this section for completed fire protection, CCTV, access control and safety projects.